Bicara Siswa


Memaparkan catatan dengan label Space. Papar semua catatan
Memaparkan catatan dengan label Space. Papar semua catatan

Rabu, 25 Februari 2009

Flow Process of Roket Lunch

Edited from Paultan's blog
Rarely Seen Shuttle Pre-Flight Activities However, these pictures deserve a wide viewing audience: the amount of thought and engineering that goes into every launch is immense; each successful take-off represents the Mankind’s finest effort, and is a wonder to behold.
(Thanks to Tim for sending this in; images courtesy Christie L. Dyett - NASA Space Coast Launch Services.)

External tank arrives by barge from Louisiana:


External tank approaches Vertical Assembly Building (VAB):

Removing external tank:



Preparing to lift the tank to vertical:



Lifting the tank:


Solid rockets are attached:


Orbiter: External tank with Solid Rocket Boosters (SRB):

Engines are attached to the shuttle in the Orbiter Processing Facility:





Shuttle in sling ready for lift in VAB:

Shuttle has been moved to VAB and will be attached to external tank:


Shuttle is attached:




Payload Preparation in Space Station Processing Facility:


Multi-Purpose Logistics Module (MPLM):

Payload carrier leaves Canister Rotation Facility:


Payload being moved to Launch Pad:


Lifting payload into position for insertion into “Discovery”
when it arrives at the pad:



Shuttle “Discovery” leaves VAB:




Trip to launch:
Length - 3 1/2 mi
Time - 6-8 hours
Arrow indicates the Launch Pad.


Crawler Control:

“Discovery” arrives at Pad:





We Have Lift Off !



On air to the space.